Menu
← Blog

British Fight Discussion 0006: Decode Article

4 July 2018 · British Fight

This post aims to decode The BF Drop 0002 using research from Asl@ns Army.

You can join in the research here:  https://bit.ly/2MazOAd

British Fight has exposed the HS2 scandal: corporations conspired with Government to thwart Mag-Lev technology and give us the HS2 white elephant at 400% of the cost.

Did it ever occur to our so-called leaders to cross check the costings of HS2 & maglev trains?

HS2 currently costed at US$340 million per km comparing Linimo HSST cost of US$100 million. https://youtu.be/0uK–rH4TWY

HS2 costed at £403 million per mile – four times the cost of Maglev for technology that is 50 years old.

Maglev trains are cheaper and the world fastest trains capable of 3,500 dm/h. https://youtu.be/aIwbrZ4knpg 

‘The HS2 high-speed rail line will cost more than £400m per mile, making it the most expensive railway in the world, according to new calculations for the government.’  https://www.thetimes.co.uk/article/building-of-hs2-to-cost-403m-a-mile-drzrdzthw

Why is maglev infrastructure almost 4 times cheaper to build, cheaper to maintain and faster?

The Shanghai maglev demonstration line cost US$1.2 billion to build in 2004.[58] This total includes capital costs such as right-of-way clearing, extensive pile driving, on-site guideway manufacturing, in-situ pier construction at 25 m (82 ft) intervals, a maintenance facility and vehicle yard, several switches, two stations, operations and control systems, power feed system, cables and inverters, and operational training. Ridership is not a primary focus of this demonstration line, since the Longyang Road station is on the eastern outskirts of Shanghai. Once the line is extended to South Shanghai Train station and Hongqiao Airport station, which may not happen because of economic reasons, ridership was expected to cover operation and maintenance costs and generate significant net revenue.

The South Shanghai extension was expected to cost approximately US$18 million per kilometre. In 2006 the German government invested $125 million in guideway cost reduction development that produced an all-concrete modular design that is faster to build and is 30% less costly. Other new construction techniques were also developed that put maglev at or below price parity with new high-speed rail construction.[59]

The United States Federal Railroad Administration, in a 2005 report to Congress, estimated cost per mile of between US$50 million and US$100 million.[60] The Maryland Transit Administration (MTA) Environmental Impact Statement estimated a pricetag at US$4.9 billion for construction, and $53 million a year for operations of its project.[61]

The proposed Chuo Shinkansen maglev in Japan was estimated to cost approximately US$82 billion to build, with a route requiring long tunnels. A Tokaido maglev route replacing the current Shinkansen would cost 1/10 the cost, as no new tunnel would be needed, but noise pollution issues made this infeasible.

The Japanese Linimo HSST, cost approximately US$100 million/km to build.[62] Besides offering improved operation and maintenance costs over other transit systems, these low-speed maglevs provide ultra-high levels of operational reliability and introduce little noise and generate zero air pollution into dense urban settings.

As more maglev systems are deployed, experts expected construction costs to drop by employing new construction methods and from economies of scale.[63]

https://www.quora.com/What-are-the-cost-differences-between-Maglev-and-conventional-high-speed-rail

Why did they bury that fact?

Because they want to keep the big budget to pay their highest salaries – HS2 executives are among highest paid public servants in UK.  The outgoing Network Railchief executive, Sir David Higgins was appointed to run HS2 at a salary of £750,000 – six times that of the current boss of the high-speed rail project.

Also, HS2 is a compulsory policy dictacted by Brussels since 1996.

‘Few Members of Parliament know that the HS2 is not actually British policy nor understand how the EU’s transport policies affect those in Britain. Nor do they realise (as do their governments) just how long the HS2 policy has been in place.

The High Speed Rail line was defined by EU Council Directive 96/48/EC as far back as 23 July 1996. A Trans-European Union Railway (TEN-R) was intended to cover the whole of the EU and HS2 was the main part of its High Speed design in Britain as was an ‘HS3’. A new rail link between Manchester and Leeds was announced on 23 June 2014 by the Chancellor George Osborne. But this, too (along with other HS Rail Lines) was conceived by the European Union and had little to do with George Osborne.’  http://www.theeuroprobe.org/2015-088-hs2-controlled-by-eu-not-our-gov/

Purpose?

To ensure their cronies get the money through contracts.

Mark Thurston was Managing Director for Europe at CH2M from June 2008 to March 2017.  In 2016 CH2M became a HS2 Phase One Engineering Delivery Partner with a £350 million contract.

Mel Ewell, Non-executive Board Member, joined in September 2016, was formerly of Amey.

Amey delivers facilities management services to HS2’s head office in London.  Amey is a subsidiary of Ferrovial.  Ferrovial Agroman, in joint venture with Morgan Sindall and BAM Nutall as FUSION, were awarded £300m contract.

Board.

HS2 Board Members (July 2018)

David Higgins, Non-executive Chair

On 1 January 2014, David Higgins was appointed Non-Executive Chair of High Speed Two (HS2) Ltd.

On 1 April 2010, he was appointed a Non-Executive Director of Network Rail Infrastructure Ltd. On 28 September 2010, he was appointed Chief Executive of Network Rail Infrastructure Limited with effect from 1 February 2011.

David was appointed Chief Executive Designate of the Olympic Delivery Authority in December 2005 & appointed Chief Executive with effect from 30 March 2006. Prior to December 2005, he was Chief Executive of English Partnerships, the Government’s national regeneration agency, for 3 years.

David graduated in Civil Engineering from the University of Sydney & holds a Diploma from the Securities Institute of Australia. Following graduation, he spent time working in the UK & Africa, returning to Australia in 1981 & joined the Lend Lease Group, an international property & construction company, in 1985. In 1995, he was appointed Managing Director & Group Chief Executive of the Group.

Mark Thurston, Executive Board Member

Mark joined High Speed Two (HS2) as Chief Executive Officer in March 2017 – replacing Simon Kirby. With more than 25 years’ experience in project and programme management, Mark has worked in both the public and private sectors on some of the UK’s largest infrastructure projects.

Previously, Mark was Managing Director for Europe at CH2M and was with the company from June 2008. During his career with CH2M Mark spent a significant amount of time in leadership roles on major programmes, including three years as Strategic Projects Director on Crossrail, leading the Programme Partner joint venture Transcend.

Prior to this Mark was Programme Delivery Manager on the London 2012 Olympic & Paralympic Games, where he led the Power Lines Under Grounding project and the £500 million Structures, Bridges and Highways programme on behalf of the CLM delivery partner consortium.

Mark has a Master’s Degree in Engineering Project Management from Loughborough University. He is also a Visiting Professor at the Bartlett School of Construction and Project Management at University College London and is an honorary Fellow of the Institution of Civil Engineers and the Association for Project Management.

Richard Brown, Non-executive Board Member

Richard Brown has held high level positions in and around the rail sector. Through his association with HS1 and Eurostar, he brings experience of the specification and delivery of major rail infrastructure, and ensuring longer term value for money. He is also able to add further value through his experience of running an operational high speed railway.

Neil Masom, Non-executive Board Member

Neil Masom has held high level positions within the Civil Aviation and Defence sectors with BAE Systems, specialising in Customer Services, Supply Chain and Information Management.

For the past five years he has held non-executive board director and audit committee chair roles within the IT Industry and also within government at the Foreign & Commonwealth Office, the Information Commissioner’s Office and within the NHS.

Christine Emmett, Non-executive Board Member

Christine has a degree in Economics and Social Sciences from the University of Manchester. She began her career as a buyer at Marks and Spencer. She has 30 years’ experience of major procurement and project management including the British Rail Channel Tunnel project and rail privatisation.

Christine is currently a Gateway Reviewer on high risk projects and has reviewed high profile projects in the health and transport sectors for the UK government, Welsh Assembly and Scottish Executive.

She has wide knowledge of best practice across government. She has been a non-executive director of two health trusts and has considerable experience working in local communities for example as chairman of her local Age UK.

Baroness Jo Valentine, Non-executive Board Member

Baroness Valentine joined London First in 1997 as Managing Director, becoming Chief Executive in 2003. Her role centres on representing to national and local government the most pressing issues affecting London’s leading businesses.

Prior to London First, Jo Valentine worked in corporate finance and planning at Barings and BOC Group. She established and ran ‘The Blackburn Partnership’ a public-private regeneration partnership in 1988 and the Central London Partnership (CLP) in 1995. She was a National Lottery Commissioner from 2000 to 2005.

She became a Crossbench Peer in October 2005 and contributes frequently to debates, mainly on economic and competitiveness issues. She sits on the House of Lords Committee which provides pre-legislative scrutiny of European infrastructure proposals. Baroness Valentine is a Non-Executive Director of Peabody, an Honorary Fellow of St Hugh’s College Oxford and Birkbeck College, and a member of the Council of University College London.

Roger Mountford, Non-executive Board Member

Roger is a former member of the Board of the Civil Aviation Authority as well as Chair of The Housing Finance Corporation, which raises long-term funds to finance social housing.

He is currently Chairman of HgCapital trust plc, an independent trustee of several pension schemes, and a member of the Council of the London School of Economics.

Mel Ewell, Non-executive Board Member

Joined in September 2016.  Mr Ewell brings a wealth of infrastructure and transport industry experience from the UK and around the world. He led Amey, one of the UK’s largest infrastructure support service companies, for 15 years. During his tenure, the company delivered major road and rail projects, including the maintenance of the iconic Forth Road Bridge. Prior to joining Amey he was Managing Director at ADI group, a provider of transport and aviation services across Europe.

https://www.gov.uk/government/organisations/high-speed-two-limited/about/our-governance

Past Board Members

2012: Richard Brown, Godric Smith, Duncan Sutherland and Mike Welton have all been appointed as non-executive directors to the board of HS2 Ltd. https://www.gov.uk/government/news/four-non-executive-directors-appointed-to-hs2-ltd

2015: Former Labour transport secretary hired as non-executive director in a move that formalises his unofficial role as a high-speed rail champion. https://www.theguardian.com/uk-news/2015/jul/16/lord-adonis-joins-board-of-hs2-project 


Dig.

2015: ‘REVEALED: HS2 executives among highest paid public servants in UK yet work on a project that may never go ahead.’ https://www.expressandstar.com/news/2015/03/23/revealed-hs2-executives-among-highest-paid-public-servants-in-uk/

A new chief executive has been appointed to run HS2 at a salary of £750,000 – six times that of the current boss of the high-speed rail project. In one of his first acts as the new HS2 chairman, the outgoing Network Railchief executive, Sir David Higgins, has recruited one of his old colleagues, Simon Kirby, the track operator’s managing director of infrastructure projects, as chief executive. https://www.theguardian.com/uk-news/2014/jan/17/hs2-chief-executive-salary-rail

Amey delivers facilities management services to HS2’s head office in London. https://www.amey.co.uk/about-us/amey-in-your-area/london-south-east/hs2-head-office/

Amey is a subsidiary of Ferrovial.  Ferrovial Agroman, in joint venture with Morgan Sindall and BAM Nutall as FUSION, were awarded £300m contract for HS2 enabling works on the Central Section of the high speed railway which will join London and Birmingham.  https://www.ferrovial.com/en/press-room/press_releases/enabling-works-high-speed-uk/

In July 2017: ‘A £77m loss from its highways business saw infrastructure giant Amey post a pre-tax loss of nearly £44m for the last year.’ https://www.transport-network.co.uk/77m-highways-loss-takes-Amey-into-the-red/14247

CH2M partner with governments, communities, businesses and organizations all over the world tackling our clients’ toughest infrastructure and natural resource challenges. https://www.ch2m.com/what-we-do

March 2016: CH2M-led joint venture announced as HS2 Phase One Engineering Delivery Partner. The £350 million contract is due to run for ten years and will see the CH2M-led consortium work with HS2 Ltd in an integrated team to drive long term efficiencies across the design and construction of the line.  https://www.ch2m.com/newsroom/news/ch2m-led-jv-announced-as-HS2-phase-one-engineering-delivery-partner

 

Originally published on Awakened England.

British Fight Discussion 0006: Decode Article — Gaia Ascension